newly replaced gates from water/sewer construction management project in florida

S-40, S-41, and S-44 Gate Replacements

Construction Management

Location: Palm Beach County, FL

Owner: South Florida Water Management District

Status: Completed

Construction Cost: $5.6 Million

The Project

The South Florida Water Management District sought to address repairs required on the vertical lift gates at their S-40, S-41, and S-44 structures. The three structures are located along the C-15, C-16, and C-17 canals.

Erdman Anthony was selected to serve as construction manager for the project. Our role included inspection services at all three sites and construction management services to observe and document construction efforts, coordinate testing, and conduct meetings.

Features/Solutions

The project included replacement of the lift gates as well as concrete repairs and refurbishments. Other improvements included:

  • Replacement of components to enhance the new gate’s performance
  • New control buildings with a generator room
  • Replacement of the railing throughout the S-40 and S-41 spillways
  • Steel and concrete repairs required at the three sites

Impacts

The new stainless-steel gates and structure upgrades have alleviated SFWMD’s operations and maintenance staff’s backlog of maintenance items and have resulted in gates that require less maintenance, exhibit a greater resistance to corrosion, and provide a reduced life-cycle cost.

Sustainable Design Impact

These important coastal water control structures allow the District to manage the surface waters of Palm Beach County addressing water quality, flood control, and water supply for the region.