This project reconfigured access between the U.S. Peace Bridge and I-190 in Buffalo. A new NB ramp (Ramp D) now provides a direct connection to I-190, including a new structure over the CSX railway tracks. Portions of Ramps C and N were rebuilt to accommodate the new ramp. Porter Avenue Bridge over the CSX tracks and I-190 was reconstructed and includes a roundabout with two realigned ramps. The Riverwalk trail was realigned and includes new bridges over the CSX tracks and I-190.The roadway going through Front Park was eliminated and the park was restored to its original configuration. This was a multiyear staged construction project. The bid included a time component for completion. The contractor worked all winter and two shifts during the summer of 2015 and 2016 to meet the scheduled completion date and claim the incentive bonus. Stage 1
Stages 2 and 3
Stage 4